Transform 66 Outside the Beltway Project construction continues throughout the corridor during daytime and overnight hours as weather conditions allow.

Significant upcoming traffic impacts include:

  • During overnight hours the nights of Aug. 7-8 and Aug. 10-14, I-66 East will be reduced to one travel lane approaching Waples Mill Road for overhead bridge work. Drivers should expect periodic stoppages of up to 20 minutes during these nights. Details
  • During overnight hours the nights of Aug. 10-13, I-66 East will be reduced to one travel lane between Vaden Drive and Cedar Lane for bridge beam installation at Cedar Lane. Drivers should expect periodic 30-minute stoppages during these nights. Details
  • During overnight hours the nights of Aug. 10-13, Route 28 North and South in Centreville will be reduced to a single travel lane in each direction with all traffic shifted to the northbound lanes. The ramps from I-66 East to Route 28 North, Route 28 South to I-66 West, and Route 28 South to I-66 East, as well as Braddock Road between Newton Patent Drive and Route 28, will be closed during this time period. Details
  • From Friday, Aug. 14, at 10:00 p.m. through Sunday, Aug. 17, at 5:00 a.m., Braddock Road will be closed between Newton Patent Drive and Route 28 for paving operations.
  • The following ramps will be closed during the overnight hours: Route 123 (Chain Bridge Road) South to I-66 West (Aug. 10); the HOV ramp from I-66 West to Monument Drive (Aug. 10); multiple ramps at Route 29 (Lee Highway) Centreville (Aug. 10-12); and the ramp from I-66 East to 495 Express Lanes South (Aug. 13). Details

Current activities include:

  • Installing bridge beams at Waples Mill Road, Braddock Road/Walney Road, and Cedar Lane
  • Paving on I-66 West in Prince William County, on Route 28 North in Centreville, and on I-66 East and West in Vienna
  • Constructing bridge foundations at Route 29, Route 28, Route 50, Jermantown Road, Route 123, Cedar Lane, Gallows Road, and I-495
  • Small charge dynamite operations along Route 28, and I-66 East and West near Route 28
  • Bridge deck work for expanded bridge over Compton Road, Cub Run, new Route 28 bridges over I-66, new Route 123 bridge over I-66, and new Vaden Drive bridge over I-66
  • Relocating utility duct bank and water lines at Stringfellow Road, Cedar Lane, and Gallows Road
  • Relocating underground utilities along I-66 East and West
  • Constructing retaining walls along I-66 and Route 28
  • Corridor-wide roadway maintenance as needed

Upcoming Lane Closures and Traffic Changes

The following planned lane closures are expected to have significant traffic impacts. All work is subject to change based on weather and schedule. Find the latest information on travel conditions and work zones by visiting 511virginia.org or downloading the Virginia511 app.

ROUTE 29 (LEE HIGHWAY) / GAINESVILLE

I-66 East and West from Route 234 (Prince William Parkway) to Route 29 Gainesville 
Monday, Aug. 10, through Friday, Aug. 14: 8:00 p.m. to 5:00 a.m.
Three lanes will be closed for overhead bridge work at University Boulevard.
I-66 East and West between Route 29 Gainesville and Groveton Road
University Boulevard between Route 29 and Rail Line Court
Monday, Aug. 10, through Friday, Aug. 14: 11:00 a.m. to 12:00 noon
Temporary 15-minute stoppages of traffic for blasting operations.
I-66 West from Manassas Safety Rest Area to Route 29 Gainesville
Ongoing
Single and multi-lane closures will be implemented for extended paving operations. The HOV lane will be closed indefinitely. Between 12:00 noon and 8:00 p.m. daily, three travel lanes will be open to all traffic. Between 8:00 p.m. and 6:00 a.m. nightly, three lanes will be closed, leaving one travel lane open. Between 6:00 a.m. and 12:00 noon daily, two lanes will be closed, leaving two travel lanes open.

ROUTE 234 BUSINESS (SUDLEY ROAD) / MANASSAS

I-66 East and West between Route 29 Gainesville and Groveton Road
University Boulevard between Route 29 and Rail Line Court
Monday, Aug. 10, through Friday, Aug. 14: 11:00 a.m. to 12:00 noon
Temporary 15-minute stoppages of traffic for blasting operations.
I-66 East from Bull Run to Compton Road
Starting 9:00 p.m., Friday, Aug. 14, continuously through 5:00 a.m., Monday, Aug. 17
Single and multi-lane closures will be implemented for bridge work. The right lane will be closed starting around 9:00 p.m., Friday night, Aug. 14, through 5:00 a.m. Monday morning, Aug. 17. Two lanes will be closed nightly between 10:00 p.m. and 6:00 a.m. (4:00 a.m. Monday morning).
I-66 West from Compton Road to Bull Run 
Starting 10:00 p.m., Friday, Aug. 14, continuously through 5:00 a.m., Monday, Aug. 17
Single and multi-lane closures will be implemented for bridge work. The right lane will be closed starting around 10:00 p.m. Friday night, Aug. 14, through 5:00 a.m. Monday morning, Aug. 17. Two lanes will be closed nightly between 10:00 p.m. and 6:00 a.m. (4:00 a.m. Monday morning).
I-66 West from Manassas Safety Rest Area to Route 29 Gainesville
Ongoing
Single and multi-lane closures will be implemented for extended paving operations. The HOV lane will be closed indefinitely. Between 12:00 noon and 8:00 p.m. daily, three travel lanes will be open to all traffic. Between 8:00 p.m. and 6:00 a.m. nightly, three lanes will be closed, leaving one travel lane open. Between 6:00 a.m. and 12:00 noon daily, two lanes will be closed, leaving two travel lanes open.

ROUTE 28 (SULLY ROAD) / CENTREVILLE

I-66 East and West between Route 29 Centreville and Stringfellow Road 
Route 28 North and South between Route 29 and Braddock Road
Monday, Aug. 10, through Friday, Aug. 14: 11:00 a.m. to 12:00 noon
Temporary 15-minute stoppages of traffic for blasting operations.
I-66 East and West from between Route 28 and Compton Road
Monday, Aug. 10, through Wednesday, Aug. 12: 9:00 p.m. to 5:00 a.m.
Two right lanes will be closed for pavement operations at the I-66/Route 29 Centreville Interchange.
Ramp from I-66 East to Route 29 Centreville
Monday, Aug. 10, through Wednesday, Aug. 12: 12:00 Midnight to 4:00 a.m.
The ramp will be closed for paving and setting concrete barrier. Traffic will be directed to continue farther east to Route 286 (Fairfax County Parkway) North, stay to the right for I-66 West, then follow signs to Route 29.
Ramp from Route 29 Centreville to I-66 West
Monday, Aug. 10, through Wednesday, Aug. 12: 12:00 Midnight to 4:00 a.m.
The ramp will be closed for paving and setting concrete barrier. Traffic will be directed to I-66 East, then to Route 286 North, then follow signs to I-66 West.
Route 28 North and South between E.C. Lawrence Park
Athletic Fields and Route 29
Monday, Aug. 10, through Thursday, Aug. 13: 9:00 p.m. to 5:00 a.m.
Route 28 North and South will be reduced to a single travel lane in each direction for bridge beam placement at Braddock Road/Walney Road. Two-way traffic will run on the northbound lanes of Route 28.
Ramp from I-66 East to Route 28 North
Monday, Aug. 10, through Thursday, Aug. 13: 9:00 p.m. to 5:00 a.m.
The ramp will be closed for overhead bridge work. Traffic will be detoured farther east to Route 286 North, stay to the right for I-66 West, then follow signs to Route 28 North.
Ramp from Route 28 South to I-66 West 
Monday, Aug. 10, through Thursday, Aug. 13: 9:00 p.m. to 5:00 a.m.
The ramp will be closed. Traffic will be detoured farther south to Route 29 South, follow signs to I-66 West and make a left at the traffic signal to access I-66 West.
Ramp from Route 28 South to I-66 East 
Monday, Aug. 10, through Thursday, Aug. 13: 9:00 p.m. to 5:00 a.m.
The ramp and two left turn lanes from Route 28 South to I-66 East will be closed. Traffic will be detoured farther south to Route 29 North, stay right and follow signs to Route 28 North, then follow signs to I-66 East.
Braddock Road between Newton Patent Drive and Route 28
Monday, Aug. 10, through Thursday, Aug. 13: 9:00 p.m. to 5:00 a.m.
Starting 10:00 p.m., Friday, Aug. 14, continuously through 5:00 a.m., Monday, Aug. 17
Braddock Road will be closed between Newton Patent Drive and Route 28. Traffic will be directed to Westfields Boulevard to access Braddock Road and/or Route 28.
Route 28 South between Westfields Boulevard and Route 29 Centreville
Friday, Aug. 14: 9:00 p.m. to 5:00 a.m.
Route 28 South will be reduced to a single lane for overhead bridge work.
Ramp from Route 28 North and South to I-66 East
Sunday, Aug. 9, through Thursday, Aug. 13: 9:00 p.m. to 5:00 a.m.
Friday, Aug. 14, and Saturday, Aug. 15: 9:00 p.m. to 8:00 a.m.
One lane of two on the ramp from Route 28 North and South to I-66 East will be closed for material hauling. Drivers should expect periodic brief stoppages for trucks to enter roadway.
Route 28 North at I-66
Ongoing 
The right lane is closed to provide an extended merge lane for the ramp from I-66 East to northbound Route 28.
Route 28 North from I-66 to Westfields Boulevard
Ongoing
Between 8:00 p.m. and 4:30 a.m. nightly, two lanes will be closed for crews to implement a traffic shift and paving. Between 9:00 a.m. and 5:00 p.m. daily, one lane will be closed.

ROUTE 286 (FAIRFAX COUNTY PARKWAY) / FAIR LAKES

Ramp from I-66 West to Monument Drive
Monday, Aug. 10: 10:00 p.m. to 9:30 a.m.
The HOV ramp will be closed for paving operations.
I-66 West from Route 50 to Route 286
Monday, Aug. 10, Wednesday, Aug. 12, and Thursday, Aug. 13: 9:00 p.m. to 5:00 a.m.
Three lanes will be closed for crews to implement a traffic shift.
ROUTE 50 / FAIRFAX
I-66 East from Waples Mill Road to Jermantown Road
Monday, Aug. 10, through Friday, Aug. 14: 8:00 a.m. to 6:00 p.m. 
The HOV lane will be closed for bridge pier construction.
I-66 West from Jermantown Road to Route 50
Monday, Aug. 10, through Thursday, Aug. 13: 9:30 p.m. to 4:30 a.m.
Friday, Aug. 14: 9:30 p.m. to 5:30 a.m.
Three lanes will be closed for bridge construction. Drivers should expect periodic stoppages of up to 20 minutes between 10:30 p.m. and 4:00 a.m.
I-66 East from West Ox Road to Waples Mill Road
Monday, Aug. 10, through Friday, Aug. 14: 9:00 p.m. to 5:00 a.m.
Three lanes will be closed for bridge construction. Drivers should expect periodic stoppages of up to 20 minutes between 10:30 p.m. and 4:00 a.m.
I-66 West from Route 50 to Route 286
Monday, Aug. 10, Wednesday, Aug. 12, and Thursday, Aug. 13: 9:00 p.m. to 5:00 a.m.
Wednesday, Aug. 12, and Thursday, Aug. 13: 9:00 p.m. to 5:00 a.m.
Three lanes will be closed for crews to implement traffic shift.
I-66 East from Monument Drive to Waples Mill Road
Continuing through Saturday, Aug. 22
The HOV lane will be closed for bridge pier construction.
Route 50 East at I-66 
Ramp from Route 50 East to I-66 East
Ongoing
The left lane will be closed for bridge abutment construction and utility work.
I-66 West from Route 50 to Fairfax County Parkway 
Ongoing
The HOV lane will be closed for bridge pier construction.

ROUTE 123 (CHAIN BRIDGE ROAD) / OAKTON – CITY OF FAIRFAX

I-66 East from Waples Mill Road to Jermantown Road
Monday, Aug. 10, through Friday, Aug. 14: 8:00 a.m. to 6:00 p.m. 
The HOV lane will be closed for bridge pier construction.
I-66 East from Jermantown Road to Route 123
Thursday, Aug. 13: 9:00 p.m. to 5:00 a.m.
Three lanes will be closed for overhead bridge work. Drivers should expect slowdowns and periodic 20-minute stoppages between 12:00 midnight and 4:00 a.m.

ROUTE 243 (NUTLEY STREET) / VIENNA

I-66 East from Vaden Drive to Cedar Lane
Monday, Aug. 10, through Thursday, Aug. 13: 9:00 p.m. to 4:30 a.m.
I-66 East will be reduced to one travel lane for bridge beam installation at Cedar Lane.  Drivers should expect periodic 30-minute stoppages between 10:00 p.m. and 3:30 a.m.
I-66 West from I-495 to Cedar Lane
Friday, August 7, and Saturday, August 8: 10 p.m. to 6 a.m.
Sunday, August 9, through Thursday, August 13: 10 p.m. to 5 a.m.
The left lane will be closed Friday night, Aug. 7, and Saturday night, Aug. 8, for bridge pier construction at Cedar Lane. Sunday, Aug. 9, through Thursday, Aug. 13, I-66 West will be reduced to one travel lane nightly.
Route 243 (Nutley Street) North and South between
Virginia Center Boulevard and Saintsbury Drive
Thursday, Aug. 13, and Friday, Aug. 14: 9:00 p.m. to 5:00 a.m.
Two lanes will be closed for crews to implement lane shifts.
Cedar Lane between Hilltop Drive and Cottage Street
Ongoing through November 
Cedar Lane over I-66 will be closed for demolition and reconstruction of the bridge.

I-495 (CAPITAL BELTWAY) / DUNN LORING

I-66 West from I-495 to Cedar Lane
Friday, Aug. 7, and Saturday, Aug. 8: 10:00 p.m. to 6:00 a.m.
Sunday, Aug. 9, through Thursday, Aug. 13: 10:00 p.m. to 5:00 a.m.
The left lane will be closed Friday night, Aug. 7, and Saturday night, Aug. 8, for bridge pier construction at Cedar Lane. Sunday, Aug. 9, through Thursday, Aug. 13, I-66 West will be reduced to one travel lane nightly.
I-495 North from Route 29 to I-66
Tuesday, Aug. 11, through Friday, Aug. 14: 10:00 p.m. to 6:00 a.m.
Two lanes will be closed for bridge construction.
Ramp from I-66 East to 495 Express Lanes South
Thursday, Aug. 13: 8:00 p.m. to 5:00 a.m.
The ramp will be closed for utility work. Traffic will be directed to take the I-495 South general purpose lanes.
I-66 East from Gallows Road to I-495
Friday, Aug. 14: 9:00 p.m. to 9:00 a.m.
I-66 East will be reduced to one travel lane for overhead bridge work. Drivers should expect periodic stoppages between 10:00 p.m. and 5:30 a.m.