Maplewood Drive Closure in Prince William Tomorrow

Google+ Pinterest LinkedIn Tumblr +

Provided by Virginia Department of Transportation (VDOT)

Maplewood Drive between Leland Road and Rugby Road will be closed to through traffic Thursday, July 18 between 9:00 a. m. and 3:00 p. m. for stormwater pipe replacement,.

Residents within the closure area and emergency vehicles will have access to the closed portion of Maplewood Drive. They will not, however, be able to go beyond the point of pipe replacement in either direction.

Through traffic will be detoured via Leland Road, Pine Street and Rugby Road back to Maplewood Drive.

Share.

Comments are closed.